Reconstruction - Few enough items we can now list them!
-cut trim by cedar closet light switch and turn switch upside right
-paint trim in back bedroom
-fix/plane bedroom door so it closes properly
-fix protruding outlet box by front door
-fix/plane front door so it closes properly
-stain and urethane bunk (also cut outlet faceplate) - Dave Sr doing
-install short counter to right of stove - Dave Sr doing
-clean out utility room and store useable wood in crawlspace
-faceplate for open outlet in utility room
-install 20 amp outdoor plug by service box
Decorating - TBD
-Grovers are taking lead on living room and back bedroom.
-Lemyres are taking lead on bunk room and kitchen.
Yard Work - There's quite a bit of this to do. Items include but are not limited to:
-cut back bamboo and other overgrowth from perimeter of yard
-trim dead and grapevines from trees
-stack wood by fire pit
-trench out yard drain
-rake out yard where drain met stone fence so it is mowable
-fill in by basement window where ground settled from drain
-rake out yard where drain met stone fence so it is mowable
-fill in by basement window where ground settled from drain
-screen end cap for drainage pipe - Andy doing
Decks - Both decks need a good cleaning and resealing. Pressure washers have been tried without success (too weak?). May require scrubbing or decks need to be replaced. They are still structurally sound. Maybe in a year or two.